Borger, TX – Control Room


Location | Borger, TX |
Building Function | Control Room |
Building Construction | 2015 |
Design Blast Load | 2.7 psi, 150 psi-msec |
BakerRisk designed blast resistant upgrades to
strengthen the exterior walls and shield the existing roof structure of this control room. The upgrade included the replacement of the exterior doors and the removal of existing windows.