New Orleans, LA – Control Room


Location | New Orleans, LA |
Building Function | Control Room |
Building Construction | 2014 |
Design Blast Load | 1.3 psi, 60 msec |
BakerRisk designed the blast resistant upgrades for an existing two-story control room. The structural upgrades were coordinated with an ongoing effort to modernize the mechanical and HVAC equipment in the building.